1. Check whether the sensor capacity and load capacity match, and all modules should bear the load evenly.
2. Adjust the level of each module to ensure that the joint surface of each module is not more than 0.5 degrees from the horizontal plane in the length direction and width direction.
3. Install the alignment tool to ensure that the limit clearance between the top plate and the sensor meets the drawing requirements (the limit gap is not adjustable).
4. Slowly lower the container onto the module.
5. When adjusting the top plate of the module, if the apex angle of the top plate in the longitudinal direction and the width direction to the horizontal plane is greater than 0.5 degrees, a stainless steel gasket may be added between the top plate and the connecting surface thereof.
6. The top plate, bottom plate and container of the module can be bolted or welded.
7. If welding is used, the welding angle is 9.5mm, the weld length is 25.4mm, and the weld spacing is 50.8mm. Do not pass current through the sensor during soldering.
8. After confirming that all the top and bottom plates are connected, slowly raise the scale body to take out the alignment tool, replace the connector, and fix the liner to the top plate with screws to cover the small holes on the top plate.
9. Slowly lower the scale body and lift it several times repeatedly to ensure that the gap between the sensor and the limit bolt is correct.
10. Install the junction box and the sensor cable should be easy to connect.
11. Connect the sensor cable and junction box correctly according to the cable color code.
12. Connect the junction box and instrument.
13. Ensure that the connection between the container and the conveyor is tight and flexible.